PROPOSITION B > PROJECT: MAIN ST. AT CAMP WISDOM RD.

This project in Proposition B includes the reconstruction of pavement and subsurface utilities along a segment of Main St. A Main St. Corridor Study was performed, and a Resolution was proposed to approve all the recommended sections along the corridor for a long-term plan and to change the focus of the current project to the Main-Center intersection and connecting streets. Resolution 2020-094 approving the Main St. Corridor Study recommendations failed to pass on December 1, 2020.

Overall Project Status

Main Street at Camp Wisdom
Study100% Complete
Design0% Complete
Construction0% Complete

Project Details

Bond Program Year: 2018

Proposition: B

Project Name: Main St. at Camp Wisdom Rd.

Project Description: Reconstruct pavement and subsurface utilities along a segment of Main Street

Project Status: Resolution 2020-094 Approving Corridor Study recommendation failed to pass.

Project Study: Main St. Corridor Study completed and presented to City Council on November 17, 2020.

Last Modified: Date January 22, 2024

Project Cost Breakdown (by %)

ESTIMATED PROJECT COST BREAKDOWN

Study (Pre-Engineering): $150,000 (7%)
Engineering & Design: $150,000 ($127K Bond - 6%); $23K Utilities CIP - 1%)
Construction: $1,733,000 ($1.373M Bond - 68%; $360K Utilities CIP - 18%)

$2,033,000

TOTAL COST