PROPOSITION B > PROJECT: S CEDAR RIDGE DRIVE

This project in Proposition B includes the reconstruction of pavement and subsurface utilities along a segment of S. Cedar Ridge Dr. between W. Camp Wisdom Rd. and Middale Rd.

Overall Progress

Cedar Ridge Road
Study100% Complete
Design83% Complete
Construction0% Complete

Project Details

Bond Program Year: 2018

Proposition: B

Project Name: S. Cedar Ridge Dr.

Project Description: Reconstruct pavement and subsurface utilities along S. Cedar Ridge Dr. between W. Camp Wisdom Rd. and Middale Rd.

Project Status: Design Underway

Last Modified Date: 07/12/2024

Project Schedule (subject to change)

Estimated Design Start: Spring 2023

Estimated Design Completion: Summer 2024 

Estimated Construction Start: Winter 2024

Estimated Construction Completion: Winter 2025

Project Cost Breakdown (by %)

ESTIMATED PROJECT COST BREAKDOWN

Study (Pre-Engineering): $50,000 (1%)
Engineering & Design: $460,000 ($230K Bond - 4%; $230K Utilities CIP - 4%)
Construction: $5,500,000 ($1.77M Bond - 29%; $3.73M Utilities and Drainage CIP 62%)

$6,010,000

TOTAL COST